ESAP 3 Baseline Survey: Ethiopia Social Accountability Program
Overview
The World Bank and the Government of Ethiopia sought to better understand how the Ethiopia Social Accountability Program (ESAP) improves service delivery and brings about behavioural and attitudinal change among Ethiopian citizens and public officials. Its third phase, ESAP 3, started in 2019 to scale social accountability up to 416 woredas nationwide.
The World Bank and the Government of Ethiopia contracted Zerihun Associates to carry out the ESAP 3 baseline survey, based on impact evaluation parameters set by the World Bank and the ESAP 3 Management Agency, in consultation with the Government.
Objectives
The primary goal was to assess the impact of ESAP on the quality of service delivery and on behavioural change among citizens and public officials. The baseline was designed to give a rigorous starting point for evaluating ESAP 3, complemented by kebele-level and woreda-level data.
Approach
Zerihun Associates went door to door, collecting data on households' demographic, economic and social activities and their participation in basic services, supplemented by community and facility data at kebele and woreda level. There were three instruments:
- a household survey
- a kebele facility and community survey, designed to be answered by a group of four to six diverse community leaders
- a woreda local-government survey
Zerihun Associates conducted a household listing and produced a fresh list of households in ESAP 3 and control enumeration areas. Enumerators and supervisors visited every household in each selected enumeration area, so that each had an equal probability of selection, recording a household ID and GPS location on a mobile form that the management team also used for monitoring.
The firm hired and trained high-quality, gender-balanced field staff who understood the cultural and linguistic nuances of door-to-door interviewing. After the field team training, all instruments were pretested and revised in consultation with the World Bank team. The final questionnaires were then translated and programmed for computer-assisted personal interviewing (CAPI) in Survey Solutions.
Fieldwork faced several challenges: locating sampled ESAP 2 households was very difficult; civil unrest in parts of the country delayed data collection and constrained community gatherings; multiple visits were needed to find knowledgeable adults; and roads in remote woredas of Oromia and Somali regions were inaccessible.
Quality assurance
Zerihun Associates produced a GPS database of sampled households, community centres and the facilities used by the community. The quality plan also provided for built-in CAPI consistency checks, a documented call-back and verification schedule, frequent uploads to the World Bank server, timestamps, supervisor spot-checks, no substitutions outside protocol, and weekly progress notes.
Scale and coverage
- 4,980 households
- A sample designed as 20 households in each of three kebeles per woreda
- Community and facility surveys at kebele level and local-government surveys at woreda level
- A sampling frame designed around ESAP 2, new ESAP 3 and matched control woredas
- Field team of 9 supervisors and 60 enumerators
Deliverables
Zerihun Associates submitted a raw dataset in Stata format, cleaned it according to strategies agreed with the technical committee, and submitted the clean data in Stata. It also carried out a basic descriptive analysis, produced the GPS database, and prepared a baseline report and a survey report.
Results and use
The baseline was designed to support ESAP 3's impact evaluation, allowing service accountability outcomes to be compared over time and across areas, and to inform World Bank and Government policy dialogue. The evaluation plan paired this baseline with an endline survey to assess change within treatment and control woredas. When Zerihun Associates later conducted the ESAP 3 endline for the World Bank, the COVID-19 pandemic and conflicts had made a longitudinal assessment unsuitable, so the endline used a fresh cross-sectional sample.
Project Details
- Client
- The World Bank / Government of Ethiopia
- Location
- Nationwide, Ethiopia
- Period
- Oct 2019 – Mar 2020
- Status
- Completed