IRC: Refugee-Host Community Water Supply Design (Hitsats)
Overview
The International Rescue Committee (IRC) contracted Zerihun Associates to help with the design and establishment of an integrated water supply system for the refugee and host communities of Hitsats town in Tigray Region, together with a business plan study and the strengthening of the Hitsats town water utility.
An IRC terms of reference also covered identifying and designing an alternative surface water source to close the potable-water gap for Hitsats refugee camp and Hitsats town. The study area lies in Asgede-Tsimbla Woreda, about 45 km west of Shire. The communities drew water from the Sebita River, where an existing irrigation weir was silted.
Objectives
The terms of reference for the surface water work set four aims:
- assess and identify a viable surface water source
- produce hydraulic, structural and electromechanical designs
- integrate the source with the redesigned integrated water supply system and business plan
- deliver environmental impact assessment (EIA) and socio-economic assessments
Approach
The terms of reference set out the method: hydro-meteorological analysis using accredited Ethiopian datasets, satellite imagery and field investigations, with a 30 m SRTM digital elevation model to delineate catchments and generate capacity-area-elevation curves. Each alternative was to be screened on hydrology (low and mean flows, and flood frequency using the GEV distribution), sediment yield and constructability.
The preliminary assessment, submitted in November 2019, compared alternatives on the Sebita River:
- Dam Option 1, on a Sebita tributary: about 23 m high with a 148 m crest, about 7.7 million cubic metres of storage, a 55 km² catchment, a comparatively lower design flood and about 8.1 km of delivery pipe
- Dam Options 2 and 3, on the main stem: catchments of 453 km² and 426 km² with high flood magnitudes, Option 2 needing a very large spillway; both were judged uneconomical
- the existing weir, which needs a pond to bridge low flows; technically and economically feasible, but requiring coordination among water users
- an upstream weir of similar feasibility, and a downstream weir judged not feasible because of gorge topography
The sites were ranked by multi-criteria analysis, weighted by simplicity, reliability, access, power, cost-effectiveness, sustainability and environmental performance. Dam Option 1 ranked best among the dams, and the existing weir with a balancing pond ranked best overall once technical, hydrologic, social and cost factors were combined.
The design was to integrate the chosen source with the broader redesign of the Hitsats water supply system. An EIA was to assess effects on upstream and downstream users and set mitigation measures, and a socio-economic survey was to cover financial viability, competing water uses, vector-risk mitigation and community benefits.
Quality assurance
The terms of reference set quality controls including topographic mapping, stamped design documents, specifications and bills of quantities, daily and weekly coordination during the design stage, a formal EIA under regional and national law, and socio-economic evidence to validate financial viability and social acceptance.
Scale and coverage
- Hitsats town and Hitsats refugee camp, Asgede-Tsimbla Woreda, Tigray
- 240 households
Deliverables
Beyond the preliminary assessment, the agreed deliverables included a preliminary design package for the preferred option; a final detailed design with reports, to-scale drawings for the intake, storage and conveyance, hydraulic schematics, specifications and bills of quantities, bid documents, capital and operation and maintenance cost estimates, and operation and maintenance manuals; an EIA and socio-economic report; and a stakeholder presentation.
Results and use
The preliminary assessment identified the existing weir with a balancing pond as the best option overall. Integrated with the redesigned system, the source was intended to provide a practical way to close the potable-water gap for refugees and hosts and to proceed to tendering and construction.
Project Details
- Client
- International Rescue Committee (IRC)
- Location
- Hitsats, Tigray, Ethiopia
- Period
- May 2019 – Dec 2019
- Status
- Completed