USAID Lowland WASH Activity: Mid-Term Evaluation
All Experiences

USAID Lowland WASH Activity: Mid-Term Evaluation

Client: AECOM International DevelopmentLocation: Somalia & SNNP Regions, EthiopiaStatus: Completed

Overview

AECOM International Development contracted Zerihun Associates, under a purchase order for USAID Lowland WASH, to carry out the mid-term assessment of the USAID Lowland Water, Sanitation and Hygiene (Lowland WASH) Activity.

Zerihun Associates conducted a midline evaluation of the Activity, measuring its progress towards the planned outcomes of key performance indicators set out in its Monitoring and Evaluation (M&E) Plan. The assessment covered lowland areas of Ethiopia, including the Somali and SNNP regions.

Objectives

The scope of work set three aims:

  • to measure mid-term progress against the Lowland WASH outcome indicators
  • to document best practices and bottlenecks
  • to recommend course corrections for the second half of the project

The key indicators for the mid-term included diarrhoea among children under five (with a two-week recall period), use of improved drinking water, water system downtime in days per year, improved sanitation, and the presence of soap and water at handwashing stations.

Approach

The assessment used mixed methods. Zerihun Associates reviewed essential documents and systems, and carried out quantitative household surveys, focus group discussions (FGDs) and key informant interviews (KIIs) to collect representative data.

The scope of work specified sampling that followed the baseline protocols (allocation to woredas and kebeles with probability proportional to size, selection of villages (gote), and then systematic random sampling of households), with a sample calculated from power assumptions, and tools to be programmed for computer-assisted personal interviewing (CAPI) with translation and back-translation into local languages.

The proposal planned five field teams with a total of 23 enumerators and five supervisors, about seven interviews per enumerator per day, a three-day training and a field test of the instruments.

Quality assurance

The quality plan provided for daily data submissions and server syncs with high-frequency checks, back-checks and supervisor observations, validity rules built into the CAPI tools, and a workshop to present the preliminary results.

Scale and coverage

  • 1,490 household surveys
  • 12 focus group discussions
  • 21 key informant interviews

Deliverables

Zerihun Associates delivered the mid-term assessment report. The agreed deliverables were an inception report with finalised tools, sampling and logistics; completed fieldwork with a draft assessment report; and the final report with clean datasets.

Results and use

Key findings of the mid-term assessment were used to analyse the key determinants affecting progress, and bottlenecks were systematically identified.

The assessment was designed to provide evidence on progress and on the determinants of WASH outcomes in pastoral lowlands, to inform adjustments to hygiene promotion, water-system reliability and sanitation strategies for the remainder of Lowland WASH.

Project Details

Client
AECOM International Development
Location
Somalia & SNNP Regions, Ethiopia
Period
Jun 2018 – Feb 2019
Status
Completed

Tags

WASHM&EImpact EvaluationHumanitarian